LXP House: Countdown to Move-In Begins

It is hard to believe 19 months have passed since the foundation lines for the LXP House were marked off on the bare ground at the LXP Base. The past month and a half has been an exciting time of seeing the realization of our dream to complete the house and move to the Base coming much closer.

The house is almost ready for inhabitants as the walls have been plastered and painted, the doors and windows hung, and the cement floors completed. The outside toilets are being built now and our name is on the waiting list to be connected to the power grid which will bring electricity to the house. Once the outside toilets are complete, we will move in! After the electricity is connected we will begin the process of installing the water pump and indoor plumbing. Then, as time goes on we will install flooring and ceilings.

We are so thankful to the Lord who has been faithful to provide for and protect this building project, and to all of you who have generously contributed to make possible this next big step in our lives and ministry!

Plastering the walls

Plastering the walls

Plastering the edges

Plastering the edges

Finished plastering

Finished plastering

Window installation

Window installation

Window installation

Window installation

Window sills

Window sills

Window sills

Window sills

Unfinished floor

Unfinished floor

Kitchen floor

Kitchen floor

Finished floors and walls

Finished floors and walls

Painted with interior doors

Painted with interior doors

Front door and porch

Front door and porch

Back of house

Back of house

Just missing the garage door

Just missing the garage door

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: